top of page

Checklist for Architects Collaborating with Facade Engineers

Updated: Aug 5

By following this detailed checklist, architects can ensure a successful collaboration with facade engineers, resulting in a building that meets performance expectations, is aesthetically pleasing, and is cost-effective.


1. INITIAL PREPARATION AND RESEARCH


Identify Needs and Goals: Clearly define the project’s goals regarding façade, including aesthetic, functional, and performance criteria.


Research Potential Engineers: Look for facade engineers with experience in similar projects. Check their portfolios, client reviews, and any relevant certifications.


Budget and Scope: Establish a clear budget and scope of work for the façade engineering services.

2. PROJECT BRIEF AND REQUIREMENTS

Prepare a comprehensive project brief that includes:


Building type and use


Design intent and architectural vision


Material preferences


Performance requirements (thermal, acoustic, structural, etc.)


Sustainability goals and certifications


Budget constraints and timelines

3. DESIGN COORDINATION


Collaborative Workshops: Schedule initial design workshops to align the architectural and engineering visions. Encourage open dialogue and brainstorming sessions.


Integration of Systems: Ensure the facade design integrates seamlessly with other building systems such as HVAC, lighting, and structural elements.


Preliminary Drawings and Models: Share preliminary architectural drawings and 3D models with the facade engineers for initial feedback.

4. PERFORMANCE CRITERIA AND TESTING


Thermal Performance: Discuss and set targets for U-values, thermal bridging, and insulation.


Acoustic Performance: Establish requirements for sound insulation and absorption.


Structural Integrity: Define the structural performance criteria, including wind loads, impact resistance, and seismic considerations.


Waterproofing and Drainage: Specify the requirements for waterproofing, moisture control, and drainage systems.


Fire Safety: Ensure the façade complies with fire safety regulations, including fire resistance and material behaviour during a fire.


Sustainability and Energy Efficiency: Set goals for energy efficiency, use of sustainable materials, and achieving specific green building certifications.

5. MATERIAL SELECTION


Material Options: Review and select appropriate materials, considering durability, aesthetics, maintenance, and cost.


Prototyping: Develop prototypes and physical mock-ups to test material performance and aesthetic qualities.


Performance Testing: Conduct performance tests on mock-ups, including thermal, acoustic, and structural tests.

6. DETAILED DESIGN AND DOCUMENTATION

Collaborate on detailed façade design drawings, including:


Plans, sections, and elevations


Connection details


Material specifications


BIM Coordination: Use Building Information Modelling (BIM) for coordination between architectural and façade engineering teams.


BIM Coordination: Use Building Information Modelling (BIM) for coordination between architectural and façade engineering teams.


Review and Approval: Schedule regular design reviews and approvals at key project milestones.

7. CONSTRUCTION PLANNING AND EXECUTION


Construction Documentation: Prepare comprehensive construction documents, including shop drawings and installation guidelines.


Procurement and Fabrication: Coordinate with suppliers and fabricators to ensure timely and accurate production of façade components.


Site Supervision: Arrange for on-site supervision during façade installation to ensure adherence to design specifications and quality standards.


Quality Control: Implement a quality control plan, including regular inspections and testing during construction.

8. POST-CONSTRUCTION AND MAINTENANCE


Final Inspections: Conduct final inspections and performance tests to ensure the façade meets all design and performance criteria.


As-Built Documentation: Provide detailed as-built documentation for future reference and maintenance.


Maintenance Plan: Develop a comprehensive maintenance plan, including cleaning schedules, inspection routines, and repair guidelines.

9. COMMUNICATION AND DOCUMENTATION


Regular Updates: Establish a communication protocol for regular updates and progress meetings.


Issue Resolution: Set up a system for addressing and resolving any design or construction issues that arise.


Documentation Management: Keep thorough documentation of all communications, design changes, and decisions made throughout the project.

10. FEEDBACK AND LESSONS LEARNED


Project Review: Conduct a post-project review with the façade engineering team to discuss what worked well and areas for improvement.


Lessons Learned: Document lessons learned and best practices for future projects.



16 views0 comments

Comentarios


bottom of page